1.Which of the following is considered a major process flow structure?• Lead Time• Fabrication• Lean Manufacturing• Project2.ISO audits result in…

1.Which of the following is considered a major process flow structure?

Lead Time

Haven’t Found The Relevant Content? Hire a Subject Expert to Help You With
1.Which of the following is considered a major process flow structure?• Lead Time• Fabrication• Lean Manufacturing• Project2.ISO audits result in…
Post Your Own Question And Get A Custom Answer
Hire Writer

• Fabrication

• Lean Manufacturing

• Project

2.ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?

• Certification is sought by any firm assuming they pay annual dues.

• 2nd Party – where a customer audits its supplier

3rd Party – where a qualified national or international standards/certifying agency serves as an auditor

• 1st Party – where a firm audits itself against ISO standards

3.Which of the following is ISO 14000 primarily concerned with?

• Quality management

• Time management

• Continuous improvement management

Environmental management

4. Which is the one correct value stream principle?

• Look for efficiencies in the factory, office, physical, procedural, and technical operations.

Eliminate waste that stops, slows down, or diverts the value stream.

• Concentrate on speeding up value-adding operations rather than removing waste.

• Keep the value stream moving at minimum velocity.

5. What is the starting point in developing a capacity plan for a health care operation?

Determining the effective capacity over time

• Estimating design capacity

• Forecasting patient demand for a reasonable length of time

• Discovery of the bottleneck operation

6. Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?

• MRP (Material Requirements Plan)

• ERP (Enterprise Resource Planning)

MPS (Master Production Schedule)

• WBS (Work Breakdown Structure)

7.Which of the following is an element that addresses elimination of waste under lean production?

Kanban production control system

• Production ahead of demand

• Minimized run times

• Group plant loading technology

8. In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?

• Level elements

• Future elements

• Past elements

Cyclical elements

9. Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:

• Reducing product quality during the assembly process

• Designing products so they can be manufactured by a virtual factory

• Reducing equipment in the production process

Simplification of the product by reducing the number of separate parts

10. Which of the following is one of the principles of reengineering?

• Quality at the source

• Do not select suppliers on the basis of price alone.

Have those who use the output of a process perform the process.

• Leverage high cost employees with lower cost employees.

11. Which of the following is a characteristic that can be used to guide the design of service systems?

• Services are all similar.

• Services businesses are inherently entrepreneurial.

• Quality work means quality service.

Services cannot be inventoried.

12. Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an evolving supply process based on functional products?

Risk hedging

• Forward looking

• Efficient

• Agile

13. There are many applications of poka-yokes in service organizations. Which of the following is one of the three-T’s used to classify poka-yokes?

• Trust

• Teamwork

Task

• Time

14. Which of the following is a major factor that distinguishes service design and development from manufacturing design and development?

• The service package has the same legal protection available to manufactured goods.

• Manufacturing is far more capital intensive than services.

• The service process and service product can be developed independently.

The service package is the major output of the development process.

15. A project can be segmented into which of the following?

• Events

• Sub-jobs

Work packages

• Success markers

16. Which of the following is a cost impact and payoff analysis tool from the operations consulting tool kit?

• Statistical tools

Decision trees

• Work sampling

• Gap analysis

17. According to the theory of constraints, which of the following can be a capacity-constrained resource (CCR)?

• Product design

• Inoperable equipment

An employee

• A customer

18. The ability to rapidly and inexpensively switch production from one product to another enables which of the following:

• Economies of shape

• Economies of size

• Economies of scale

Economies of scope

19. According to the theory of constraints, which of the following financial measurements can be used to measure the firm’s ability to make money?

• Operating expenses

• Dividends

• Sales

Return on investment

20. Deming’s PDCA (plan, do, check, and act) cycle underlies what inherent Six Sigma principle?

Continuous improvement

• Control charting

• Standard deviation

• Project management

21. Which of the following is usually included as an inventory holding cost?

• Order placing

• Quantity discounts

Breakage

• Typing up an order

22. Which production process term best describes the situation when activities in a stage of production must stop because there is no work?

• Blocking

Starving

• Staging

• Buffering

span style=”font-size: 11.5pt;”> 

23. In a Gantt chart the vertical axis represents which of the following?

• Time

• Revenue

Tasks

• Cost

24. The Shingo system states that the way to prevent defects from coming out at the end of a process is to do which of the following:

• Redesign the process in order to mitigate the bottlenecks.

• Utilize SQC (statistical quality control).

Introduce controls within the process.

• Slow down production rates until the process is in control.

25. Which of the following terms describes the time a unit spends actually being worked on together with the time spent waiting in a queue?

Flow time

• Build time

• Cycle time

• Run time

26. Which of the following is one of Dr. Eli Goldratt’s rules of production scheduling for optimized production technology?

• An hour saved at a bottleneck operation does not increase the process flow.

• If you lose an hour at a bottleneck it is better than making scrap.

• Do not allow bottlenecks to govern the flow of the line.

Utilization and activation of a resource are not the same.

27. During the implementation of a project, which of the following should be the primary focus of a consulting firm?

• The correct project software

• Application of the learning curve theory

Tools and materials availability

• People management skills

28. Which of the following is an analytical tool used in Six-Sigma quality improvement programs?

• Gantt charts

Pareto charts

• Tree charts

• Pedigree charts

29. A project manager must consider several components when overseeing the planning process of aggregate operations; specifically, whether such components are factors that are internal or external to the organization. Which of the following factors would be classified as an internal component for an organization?

• Inventory levels and economic conditions

• Market demand and subcontractor capacity

Current physical capacity and current workforce

• Competitor behavior and current workforce

30. Which of the following is the net requirement using an MRP program if the gross requirement is 10,000 and the inventory on hand is 4,000?

• 10,000

• 14,000

6,000

• 4,000

Calculate the price of your order

Select your paper details and see how much our professional writing services will cost.

We`ll send you the first draft for approval by at
Price: $36
  • Freebies
  • Format
  • Formatting (MLA, APA, Chicago, custom, etc.)
  • Title page & bibliography
  • 24/7 customer support
  • Amendments to your paper when they are needed
  • Chat with your writer
  • 275 word/double-spaced page
  • 12 point Arial/Times New Roman
  • Double, single, and custom spacing
  • We care about originality

    Our custom human-written papers from top essay writers are always free from plagiarism.

  • We protect your privacy

    Your data and payment info stay secured every time you get our help from an essay writer.

  • You control your money

    Your money is safe with us. If your plans change, you can get it sent back to your card.

How it works

  1. 1
    You give us the details
    Complete a brief order form to tell us what kind of paper you need.
  2. 2
    We find you a top writer
    One of the best experts in your discipline starts working on your essay.
  3. 3
    You get the paper done
    Enjoy writing that meets your demands and high academic standards!

Samples from our advanced writers

Check out some essay pieces from our best essay writers before your place an order. They will help you better understand what our service can do for you.

Get your own paper from top experts

Order now

Perks of our essay writing service

We offer more than just hand-crafted papers customized for you. Here are more of our greatest perks.

  • Swift delivery
    Our writing service can deliver your short and urgent papers in just 4 hours!
  • Professional touch
    We find you a pro writer who knows all the ins and outs of your subject.
  • Easy order placing/tracking
    Create a new order and check on its progress at any time in your dashboard.
  • Help with any kind of paper
    Need a PhD thesis, research project, or a two-page essay? For you, we can do it all.
  • Experts in 80+ subjects
    Our pro writers can help you with anything, from nursing to business studies.
  • Calculations and code
    We also do math, write code, and solve problems in 30+ STEM disciplines.

Frequently asked questions

Get instant answers to the questions that students ask most often.

See full FAQ
  • What if I’m dissatisfied with the paper I get?

    The average quality score at our professional custom essay writing service is 8.5 out of 10. The high satisfaction rate is set by our Quality Control Department, which checks all papers before submission. The final check includes:
    • Compliance with initial order details.
    • Plagiarism.
    • Proper referencing.
    If for some reason we happen to leave a mistake unnoticed, you are invited to request unlimited revisions of your custom-written paper. For more information, check our Revision Policy. We will do our best to make your experience with Familiar Essays enjoyable.
  • I need an essay on the same day. Is it something you can do?

    Sure. Our writing company offers a fast service with an 8-hour deadline for orders up to master’s level. Make sure to specify the deadline in the order form and our writers will write a paper within the indicated timeslot. Just proceed to submit your requirements here Once you order a custom-written essay, our managers will assign your order to the well-suited writer, who has the best skills and experience for preparing your specific assignment. You can also request one of these extra features:
    • Choose the Writer’s Samples option – study 3 randomly-provided pages from orders that have been written by the assigned writer.
    • Request a specific writer – choose an academic writer from the dropdown list in the order’s form (optional for returning customers).
    You can be sure that your custom writing order will be accomplished by one of our 400+ professional academic writers. They all pass a series of tests to prove their writing prowess and hold the reputation of being the most professional in the industry. Want to make sure writer’s skills match your needs? Get more details on how to choose the appropriate author.
  • How can I be sure your writing service is not a scam?

    We understand that a shade of mistrust has covered the paper writing industry, and we want to convince you of our loyalty. Apart from high-quality writing services, we offer:
    • The chances of students to boost writing skills in a quick and effective way.
    • The opportunity to manage studies and free time in an enjoyable manner.
    • The possibilities to improve overall academic performance.
    Our custom writing company has been working for more than 12 years and always puts quality and clients’ needs first. Our operations are legally documented, we are easily accessible online and offline,
  • Is it legal to use your professional writing service?

    Yes. Custom writing help is not prohibited by any university or college. It’s a 100% legal way of getting professional assistance with paper writing. Hiring writers from an essay writing company is in many ways similar to consulting a tutor – we help you solve the writing issues at hand.
  • How does your service work?

    Our custom writing service is a reliable solution on your academic journey that will always help you if your deadline is too tight. You fill in the order form with your basic requirements for a paper: your academic level, paper type and format, the number of pages and sources, discipline, and deadline. Then, you describe the specific details of the paper you need: add the topic, write or paste the instructions, and attach files to be used, if you have them. After that, an online customer support representative chooses the best writer that specializes in your discipline and assigns him or her to complete the paper according to your requirements. When the paper is ready, we check it for plagiarism and send it to you. If you want to change something, you can request a free revision.
See full FAQ

Take your studies to the next level with our experienced specialists

Live ChatWhatsApp